追蹤
◣★鄭文彥牙醫診所☆◥
關於部落格
台北市士林區文林路678號2樓
預約專線:(02)2833-0799
主要採預約掛號為主
  • 63449

    累積人氣

  • 4

    今日人氣

    0

    追蹤人氣

How to carry out the socket preservation in fractured 1st molar for further 1-stage implantation (如何施行齒槽脊保存術)

biting pain on #36 with buccal gumboil (canon f108)
deep probing depth (canon f108)
radiolucent image around the mesial root, root fracture should be R/O
carrying out the socket preservation procedures 1-week after removing the crown (canon f108)
vertical root fracture along the mesial root was found after flap elevation and removal of all the granulation tissue (canon f108)
buccal dehiscent defect was found (canon f108)
trimming the collagen membrane to an ideal shape to cover all the entrance and defect of the socket
membrane try-in (canon f108)
lifting up the membrane on the buccal side and filling all defect with cancellous and cortical FDBA(1:1) (canon f108)
covering the graft with the membrane (canon f108)
suturing back the flap (canon f108)
depending on patient's schedule, sutural removal 6-day post-op (canon f108)
4-week post-op (canon f108)
5-week post-op (canon f108)
10.5-month post-op, depending on patient's schedule, time to carry out the 1-stage implantation (canon f108)
implant was in an ideal position and angulation (canon f103,105)
little gap between the distal side of the healing cap and the distal incision line (canon f108)
rotated pedicle flap to seal the gap (canon f108)
f103,105
before extraction
on the date of socket preservation
10.5-month after socket preservation
before socket preservation (canon f108)
after socket preservation (canon f108)
before socket preservation (canon f108)
after socket preservation (canon f108)
相簿設定
標籤設定
相簿狀態