◣★鄭文彥牙醫診所☆◥

關於部落格
台北市士林區文林路678號2樓
預約專線:(02)2833-0799
主要採預約掛號為主
  • 61716

    累積人氣

  • 2

    今日人氣

    0

    訂閱人氣

simple, single posterior ITI implantation

3-yrs ago before sinus-lift and implantation on upper L't molar area
after sinus-lift and implantation on upper L't molar area
1.5-yr ago, p't bit something hard inducing cracked tooth, distal papillary swelling and severe pain around lower 1st molar
after thorough examination, this molar was hopeless and implant therapy was the further treatment plan after taking out of this tooth
osseous surgery to eliminate shallow crater defect in mesioproximal area of 2nd molar
suturing socket without bone graft
suture removal 10-day post-op
8-month post-op, time to do implant surgery
minor ridge resorption around buccal edentulous area
pedicle flap for primary closure
reconstructing environmental contour around implant with flap design
suture removal 10-day post-op
4-month post-op, time to fabricate the final prosthesis
note the emergency profile ( R't: buccal, L't: lingual )
before treatment
after treatment
6-month after setting final prosthesis
buccal contour and environment around implant
lingual contour and environment around implant
相簿設定
標籤設定
相簿狀態